Payra LNG Power Plant 3600 MW

Payra LNG Power Plant 3600 MW: Payra Liquefied Natural Gas Power Station

The electricity demand is increasing day by day in Bangladesh. So, it is essential to produce electricity for the demand. On 19 March 2015, North-West Power Generation Company Limited (NWPGCL) and China National Machinery Import and Export Corporation (CMC) was signed conduct to create a new electricity generation company.

On the contrary of conduct, NWPGCL and CMC joint venturously set up Payra LNG (Liquefied Natural Gas) Power Plant. The plant capacity is 3600 MV which is divided into three parts. Each of the capabilities of the part is 1200 MV.

All About Payra LNG Power Plant

Payra LNG Power Plant is located in the south zone of Bangladesh. The plant was built on the bank of the River Galachipa in the Patuakhali district. The plant produces electricity by using Liquefied Natural Gas by converting it to thermal power.

  • Plant Type: Gas-Fired Power Plant
  • Location: Kalapara Upazila, Patuakhali District, Barisal Division, Bangladesh.
  • Capacity: 3600 Megawatt (MW)
  • Investment: 1.56 billion U.S Dollar
  • Organization Type: Electricity Generation

Payra LNG Power Plant Project Details

North-West Power Generation Company Limited (NWPGCL) and China National Machinery Import and Export Corporation (CMC) sponsor the Payra LNG Power Plant. The whole of the companies is under the Bangladesh Power Development Board (BPDB).

The two joint venture companies have created 3600 MV capacitive plants. The two chief executive officers of North-West Power Generation Company and China National Machinery Import and Export Corporation have signed the agreement papers. Khorshed Alam and Joe Kaeser signed the document on behalf of the company.

Payra LNG Power Plant Photo Gallery

Here you can see the photo of the Payra LNG Power Plant. The view of the plant is so charming and beautiful.

Payra LNG Power Plant Construction Details

The two electricity distribution giant companies built Payra Power Plant. The plant was built on a riverbank with the materials of concrete, iron, and other objects. The river is very useful to transport electricity-producing raw materials efficiently. The total area of the plant is 397-hectare. The plant consists of three units, each with a capacity of 1200 MW.

Raw Materials Of Payra LNG Power Plant

Bangladesh is self-sufficient in natural gas. Almost the ratio of 94% Mithen is in the gas. Bangladeshi natural gas is known as 99% pure all over the world. LNG means Liquefied Natural Gas. So it is straightforward to consider which materials are used in Payra LNG Power Plant. Natural gas is the primary raw material of Payra LNG Power Plant.

Payra LNG Power Plant Location And Contact Information

It is essential to communicate with others. There are many methods to share with others. Now this time, people prefer to communicate online and through electronic media. All of the methods are given below:

Electricity is a crying needed object for the modern era. Electricity is an essential object of the modern era. We can not think of a day without electricity. Many power plant provides us electricity. Payra LNG Power Plant is one of them. It helps the increasing developing Bangladesh economy.